Desalination

Project Ⅰ

Project Background:

In 2010, SCHW undertook a desalination projectfor a Military Island, provided equipment such as power equipment, DAF, UF skid and RO skid. Besides, SCHW also provided services such as engineering design, installation and commission. The capacity of this project is 20m3/day, and the water quality need to achieve the standard of potable water.


Desalination Inlet and Outlet Water Quality:

Parameters Influent Quality Effluent Quality
Salinity(mg/L) ≤38000 ≤600
pH 3.0-10.0 6.5~8.5
System desalination rate ≥98%
Recovery Rate 35%-50%


Processes
:
项目案例-海水淡化.jpg