Constructed Wetland

Project Ⅰ

Project Background:

A Taiwan precision processing factory needs to treat and recycle wastewater by ecological method. In 2017, SCHW undertook the company’s constructed wetland project (150m3/day), provided equipment such as power equipment, screen and high efficiency sedimentation tank. Besides, SCHW also provided services such as engineering design, installation and commission.


Ecological Water Environment Inlet and Outlet Water Quality:

Parameters Inlet Water Quality Outlet Water Quality
COD(mg/L) ≤200 ≤15
BOD(mg/L) ≤80 ≤5
SS(mg/L) ≤60 ≤1


Processes: